search in the Games ...

Type to start search (at least 3 letters)

Rockstar New England, Rockstar Vancouver, Rockstar London, Rockstar Toronto
Max Payne 3: Complete Edition v1.0.0.216 + All DLCs
Shooter
Platforms: Xbox 360, Mac, PlayStation 3, PC (Microsoft Windows)
Max Payne 3 is a third-person shooter in which the player assumes the role of its titular character, Max Payne. A new...
82.7K
downloads
Show full gallery
File Size:
13.9GB
Release Date:
May 15, 2012
Steam:
Repack Features:

NO, YOU CAN’T PLAY IN MULTIPLAYER FOR FREE.

Based on Max Payne 3 CE v1.0.0.216 Steam release: 32.5 GB

Max_Payne_3.CrackOnly.Mr_Goldberg applied over

100% Lossless & MD5 Perfect: all files are identical to originals after installation

NOTHING ripped, NOTHING re-encoded

Significantly smaller archive size (compressed from 32.5 to 13.9 GB)

Installation takes: ~20 minutes on 8-threads CPU; ~40 minutes on 4-threads CPU

After-install integrity check so you could make sure that everything installed properly

HDD space after installation: 33 GB

Repack uses XTool library by Razor12911

At least 2 GB of free RAM (inc. virtual) required for installing this repack

The Minimum Requirement:

Operating System: Windows 7 32/64 Service Pack 1, Windows Vista 32/64 Service Pack 2, Windows XP 32/64 Service Pack 3

Processor: Processor: Intel Dual Core 2.4 GHZ - i7 3930K 6 Core x 3.06 GHZ / AMD Dual Core 2.6 GHZ - FX8150 8 Core x 3.6 GHZ

RAM: 2 GB

Video Card: NVIDIA® 8600 GT 512MB VRAM – NVIDIA® GeForce® GTX 680 2GB VRAM / Radeon HD 3400 512MB VRAM - Radeon HD 7970 3GB VRAM

DirectX: 9.0c

HDD Space: 33 GB

Story
For Max Payne, the tragedies that took his loved ones years ago are wounds that refuse to heal. No longer a cop, close to washed up and addicted to pain killers, Max takes a job in San Paulo, Brazil, protecting the family of wealthy real estate mogul Rodrigo Branco, in an effort to finally escape his troubled past. But as events spiral out of his control, Max Payne finds himself alone on the streets of an unfamiliar city, desperately searching for the truth and fighting for a way out.

Combining cutting edge shooting mechanics with a dark and twisted story, Max Payne 3 is a seamless, highly detailed, cinematic experience from Rockstar Games.


Notes:
- you can download game and optional downloads from the above button 'Download Now'.
- the above download button is REAL! we're using here Adshrink service !
- We Are human, and we may make mistakes, please report below if there is an error.
poster for Pharaonic 2017
Pharaonic 2017
Action Game
560MB
poster for Infinite Tanks 2017 Repack (Cracked)
Infinite Tanks 2017 Repack (Cracked)
Action Game
900MB
poster for Mass Effect: Andromeda Super Deluxe Edition v1.10 + All DLCs
Mass Effect: Andromeda Super Deluxe Edition v1.10 + All DLCs
Adventure, Role-playing (RPG), Shooter
28.6GB
poster for Battlefield 1: Digital Deluxe Edition Update 3 + 3 DLC
Battlefield 1: Digital Deluxe Edition Update 3 + 3 DLC
Shooter
25.7GB
poster for Inner Chains
Inner Chains
Action Game
4.6GB
poster for  Rise of the Tomb Raider: 20 Year Celebration v1.0.1026.0 (Denuvoless) + All DLCs
Rise of the Tomb Raider: 20 Year Celebration v1.0.1026.0 (Denuvoless) + All DLCs
Adventure, Shooter
12.9GB

Keywords: